Our members:
Nuclear Basics
Information Library
The WNA
Members Login
Home
›
Information Library
›
Nuclear Database
Basic Search
|
Advanced Search
|
Return To Results
Doel-4, Belgium
Overview
CURRENT STATUS
Operable
DETAILS
Reactor Type
Commercial Reactor
Process
PWR
Vendor
Acecowen
Owner
Societes Reunies D''energie Du Bassin De L''escaut Sa
Model
WE 3-loops
Operator
Electrabel M. V. Nucleaire Produktie
Capacity Net
1039 MWe
Capacity Gross
1090 MWe
Capacity Thermal
2988 MWt
CONSTRUCTION AND OPERATION
Start Construction
1 December 1978
Criticality
31 March 1985
Grid Connection
8 April 1985
Commercial Operation
1 July 1985
OPERATING PERFORMANCE
Output Life
203.14 TWh
Capacity Factor Life
83.7 %