Our members:
Nuclear Basics
Information Library
The WNA
Members Login
Home
›
Information Library
›
Nuclear Database
Basic Search
|
Advanced Search
|
Return To Results
St. Alban-2, France
Overview
CURRENT STATUS
Operable
DETAILS
Reactor Type
Commercial Reactor
Process
PWR
Vendor
Framatome
Owner
Electricite De France
Model
P4 REP 1300
Operator
Electricite De France
Capacity Net
1335 MWe
Capacity Gross
1381 MWe
Capacity Thermal
3817 MWt
CONSTRUCTION AND OPERATION
Start Construction
31 July 1979
Criticality
7 June 1986
Grid Connection
3 July 1986
Commercial Operation
1 March 1987
OPERATING PERFORMANCE
Output Life
205.58 TWh
Capacity Factor Life
67.4 %