Peach Bottom-3, United States
|
| Reactor Type | Commercial Reactor |
| Process | BWR |
| Vendor | General Electric (GE) |
| Owner | Exelon Corp. (50%) Pseg Power (50%) |
| Model | BWR-4 (Mark 1) |
| Operator | Exelon Generation Co., Llc |
| Capacity Net | 1138 MWe |
| Capacity Gross | 1182 MWe |
| Capacity Thermal | 3514 MWt |
| |
|
| Start Construction | 31 January 1968 |
| Criticality | 7 August 1974 |
| Grid Connection | 1 September 1974 |
| Commercial Operation | 23 December 1974 |
| |
|
| Output Life | 267.38 TWh |
| Capacity Factor Life | 74.9 % |