Sizewell-A2, United Kingdom
| CURRENT STATUS |
| Permanent Shutdown |
|
| Reactor Type | Commercial Reactor |
| Process | GCR |
| Vendor | EE/BW/TW |
| Owner | Nuclear Decommissioning Authority |
| Model | MAGNOX |
| Operator | Magnox Electric Limited |
| Capacity Net | 210 MWe |
| Capacity Gross | 245 MWe |
| Capacity Thermal | 1010 MWt |
| |
|
| Start Construction | 1 April 1961 |
| Criticality | 1 December 1965 |
| Grid Connection | 9 April 1966 |
| Commercial Operation | 15 September 1966 |
| Shutdown | 31 December 2006 |
| |
|
| Output Life | 53.34 TWh |
| Capacity Factor Life | 71.3 % |