Dungeness-B2, United Kingdom
|
| Reactor Type | Commercial Reactor |
| Process | GCR |
| Vendor | Atomic Power Construction (APC) |
| Owner | Edf Energy |
| Model | AGR |
| Operator | Edf Energy |
| Capacity Net | 520 MWe |
| Capacity Gross | 615 MWe |
| Capacity Thermal | 1500 MWt |
| |
|
| Start Construction | 1 October 1965 |
| Criticality | 4 December 1985 |
| Grid Connection | 29 December 1985 |
| Commercial Operation | 1 April 1989 |
| |
|
| Output Life | 82.3 TWh |
| Capacity Factor Life | 49.3 % |