Our members:
Nuclear Basics
Information Library
The WNA
Members Login
Home
›
Information Library
›
Nuclear Database
Basic Search
|
Advanced Search
|
Return To Results
Belleville-1, France
Overview
CURRENT STATUS
Operable
DETAILS
Reactor Type
Commercial Reactor
Process
PWR
Vendor
Framatome
Owner
Electricite De France
Model
P4 REP 1300
Operator
Electricite De France
Capacity Net
1310 MWe
Capacity Gross
1363 MWe
Capacity Thermal
3817 MWt
CONSTRUCTION AND OPERATION
Start Construction
1 May 1980
Criticality
9 September 1987
Grid Connection
14 October 1987
Commercial Operation
1 June 1988
OPERATING PERFORMANCE
Output Life
201.9 TWh
Capacity Factor Life
70.4 %
Belleville 1 and 2