FitzPatrick, United States

Overview
CURRENT STATUS
Operable
DETAILS
Reactor TypeCommercial Reactor
ProcessBWR
VendorGeneral Electric (GE)
OwnerEntergy Nuclear Operations, Inc.
ModelBWR-4 (Mark 1)
OperatorEntergy Nuclear Operations, Inc.
Capacity Net813 MWe
Capacity Gross849 MWe
Capacity Thermal2536 MWt
 
CONSTRUCTION AND OPERATION
Start Construction1 September 1968
Criticality17 November 1974
Grid Connection1 February 1975
Commercial Operation28 July 1975
 
OPERATING PERFORMANCE
Output Life199.41 TWh
Capacity Factor Life75.6 %
 

 
 


Reactor Operational Details

YearReference Unit Power MWAnnual Output GWhAnnual Time On Line HoursCapacity Factor %Operational Factor %
19758212153.7436950.470.1
19766704156.4628470.671.5
19777703893.4598657.768.3
19788004197.4631159.972
19798002964.7445042.350.8
19808024334.1616261.570.2
19818104779.7653967.474.6
19828104959.7657069.975
19838104634.3618365.370.6
19848104899.36674568.976.8
19858104166.52557658.763.6
19867966015.61793186.190.5
19877944198.34589160.367.2
19887784356.87584463.566.5
19897576155.35794492.890.7
19907824601.93604567.269
19917803376.75453449.451.8
19927800000
19937804746.46630169.571.9
19947744972.63722473.382.5
19957804804.03633670.572.3
19967625290.38703678.680.1
19977996624.58831094.694.9
19987854930.5661371.775.5
19998136567.39820593.793.7
20008136024.77761784.486.7
20018137090.5863999.698.6
20028136595.02811292.692.6
20038136965.97843597.896.3
20048136455.92798490.490.9
20058257052.31840397.695.9
20068526758.75810890.692.6
20078526918.35831892.795
20088526691.05810589.492.3
20098547398.07876098.9100
20108556361.48790884.990.3
20118557243.97876096.7100
20128136070.4675368585.8
201300000
Total:199406.72

Source: Operating details - IAEA PRIS
Note: "0" signifies a zero value, or no data available. Data from 1972 or later. 

Quick Search

 

Reactors in United States

Arkansas Nuclear One-1
Arkansas Nuclear One-2
Beaver Valley-1
Beaver Valley-2
Big Rock Point
Bonus (Demo)
Braidwood-1
Braidwood-2
Browns Ferry-1
Browns Ferry-2
Browns Ferry-3
Brunswick-1
Brunswick-2
Byron-1
Byron-2
Callaway-1
Calvert Cliffs-1
Calvert Cliffs-2
Carolinas CVTR
Catawba-1
Catawba-2
Clinton-1
Columbia (WNP-2)
Comanche Peak-1
Comanche Peak-2
Cooper
Crystal River-3
Davis Besse-1
Diablo Canyon-1
Diablo Canyon-2
Donald Cook-1
Donald Cook-2
Dresden-1
Dresden-2
Dresden-3
Duane Arnold-1
Elk River
Enrico Fermi-1
Enrico Fermi-2
Farley-1
Farley-2
FitzPatrick
Fort Calhoun-1
Fort St Vrain
Grand Gulf-1
H B Robinson-2
Haddam Neck
Hallam
Hatch-1
Hatch-2
Hope Creek-1
Humboldt Bay
Indian Point-1
Indian Point-2
Indian Point-3
Kewaunee
LaCrosse
LaSalle-1
LaSalle-2
Limerick-1
Limerick-2
Maine Yankee
McGuire-1
McGuire-2
Millstone-1
Millstone-2
Millstone-3
Monticello
Nine Mile Point-1
Nine Mile Point-2
North Anna-1
North Anna-2
Oconee-1
Oconee-2
Oconee-3
Oyster Creek
Palisades
Palo Verde-1
Palo Verde-2
Palo Verde-3
Peach Bottom-1
Peach Bottom-2
Peach Bottom-3
Perry-1
Pilgrim-1
Piqua
Point Beach-1
Point Beach-2
Prairie Island-1
Prairie Island-2
Quad Cities-1
Quad Cities-2
R E Ginna
Rancho Seco
River Bend-1
Salem-1
Salem-2
San Onofre-1 (SONGS-1)
San Onofre-2
San Onofre-3
Seabrook-1
Sequoyah-1
Sequoyah-2
Shearon Harris-1
Shippingport
Shoreham
South Texas-1
South Texas-2
St. Lucie-1
St. Lucie-2
Surry-1
Surry-2
Susquehanna-1
Susquehanna-2
Three Mile Island-1
Three Mile Island-2
Trojan
Turkey Point-3
Turkey Point-4
Vallecitos VBWR
Vermont Yankee
Virgil C Summer-1
Virgil C. Summer-2
Virgil C. Summer-3
Vogtle-1
Vogtle-2
Vogtle-3
Vogtle-4
Waterford-3
Watts Bar-1
Watts Bar-2
Wolf Creek
Yankee Rowe
Zion-1
Zion-2