Oldbury-1, United Kingdom
| CURRENT STATUS |
| Permanent Shutdown |
|
| Reactor Type | Commercial Reactor |
| Process | GCR |
| Vendor | The Nuclear Power Group (TNPG) |
| Owner | Nuclear Decommissioning Authority |
| Model | MAGNOX |
| Operator | Magnox Electric Limited |
| Capacity Net | 217 MWe |
| Capacity Gross | 230 MWe |
| Capacity Thermal | 730 MWt |
| |
|
| Start Construction | 1 May 1962 |
| Criticality | 1 August 1967 |
| Grid Connection | 7 November 1967 |
| Commercial Operation | 31 December 1967 |
| Shutdown | 29 February 2012 |
| |
|
| Output Life | 62.26 TWh |
| Capacity Factor Life | 76.2 % |