Armenia-2 (Metsamor), Armenia
|
| Reactor Type | Commercial Reactor |
| Process | PWR |
| Owner | Ministry Of Energy And Natural Resources Of Ra |
| Model | VVER V-270 |
| Operator | Closed Joint Stock Company Armenian Npp |
| Capacity Net | 375 MWe |
| Capacity Gross | 408 MWe |
| Capacity Thermal | 1375 MWt |
| |
|
| Start Construction | 1 July 1975 |
| Criticality | 1 January 1980 |
| Grid Connection | 5 January 1980 |
| Commercial Operation | 3 May 1980 |
| Long Term Shutdown Date | 18 March 1989 |
| Grid sync after long term shutdown | 5 November 1995 |
| |
|
| Output Life | 57.87 TWh |
| Capacity Factor Life | 64.2 % |