Armenia-2 (Metsamor), Armenia

Overview
CURRENT STATUS
Operable
DETAILS
Reactor TypeCommercial Reactor
ProcessPWR
OwnerMinistry Of Energy And Natural Resources Of Ra
ModelVVER V-270
OperatorClosed Joint Stock Company Armenian Npp
Capacity Net375 MWe
Capacity Gross408 MWe
Capacity Thermal1375 MWt
 
CONSTRUCTION AND OPERATION
Start Construction1 July 1975
Criticality1 January 1980
Grid Connection5 January 1980
Commercial Operation3 May 1980
Long Term Shutdown Date18 March 1989
Grid sync after long term shutdown5 November 1995
 
OPERATING PERFORMANCE
Output Life57.87 TWh
Capacity Factor Life64.2 %
 
Armenia Metsamor

Armenia Metsamor


 
 


Reactor Operational Details

YearReference Unit Power MWAnnual Output GWhAnnual Time On Line HoursCapacity Factor %Operational Factor %
198000000
198100000
198200000
198300000
198400000
198500000
198600000
19874082629.08704073.680.4
19883762254.53674168.376.7
198900000
199000000
199100000
199200000
199300000
199400000
199500000
19963762097.98756163.586.1
19973761429.96570043.465.1
19983761416.4764084373.2
19993761890.37619357.470.7
20003761841.51569955.864.9
20013761815.41566055.164.6
20023762078.9696163.179.5
20033761997.55612060.669.9
20043762196.58713566.581.2
20053762504.4976587687.4
20063762421.62763273.587.1
20073762347.83744771.385
20083762265.89701368.679.8
20093752290.42740869.784.6
20103752286.54753569.686
20113752356.84755271.886.2
20123752123.5705264.580.3
201300000
Total:40245.47

Source: Operating details - IAEA PRIS
Note: "0" signifies a zero value, or no data available. Data from 1972 or later. 

Quick Search