|
| Reactor Type | Commercial Reactor |
| Process | PHWR |
| Vendor | Indian Department of Atomic Energy (DEA) |
| Owner | Nuclear Power Corporation Of India Ltd. |
| Model | Horizontal Pressure Tube type |
| Operator | Nuclear Power Corporation Of India Ltd. |
| Capacity Net | 202 MWe |
| Capacity Gross | 220 MWe |
| Capacity Thermal | 800 MWt |
| |
|
| Start Construction | 10 May 2002 |
| Criticality | 27 November 2010 |
| Grid Connection | 19 January 2011 |
| Commercial Operation | 20 January 2011 |
| |
|
| Output Life | 2.35 TWh |
| Capacity Factor Life | 68.4 % |
| WNN Link | First criticality for fourth Kaiga unit |
| WNN Link | Kaiga 4 connected to grid |