| Reactor Type | Commercial Reactor |
| Process | PWR |
| Vendor | Combustion Engineering (CE) |
| Owner | Entergy Nuclear Operations, Inc. |
| Model | CE (2-loop) DRYAMB |
| Operator | Entergy Nuclear Operations, Inc. |
| Capacity Net | 793 MWe |
| Capacity Gross | 845 MWe |
| Capacity Thermal | 2565 MWt |
| |
|
| Start Construction | 14 March 1967 |
| Criticality | 24 May 1971 |
| Grid Connection | 31 December 1971 |
| Commercial Operation | 31 December 1971 |
| |
|
| Output Life | 172.93 TWh |
| Capacity Factor Life | 67.9 % |