Douglas Point (Prototype), Canada

Overview
CURRENT STATUS
Permanent Shutdown
DETAILS
Reactor TypeCommercial Reactor
ProcessPHWR
VendorAtomic Energy of Canada Ltd (AECL)
OwnerAtomic Energy Of Canada Ltd.
ModelCANDU 200
OperatorOntario Hydro
Capacity Net206 MWe
Capacity Gross218 MWe
Capacity Thermal704 MWt
 
CONSTRUCTION AND OPERATION
Start Construction1 February 1960
Criticality15 November 1966
Grid Connection7 January 1967
Commercial Operation26 September 1968
Shutdown4 May 1984
 
OPERATING PERFORMANCE
Output Life15.63 TWh
Capacity Factor Life55.6 %
 

 
 


Reactor Operational Details

YearReference Unit Power MWAnnual Output GWhAnnual Time On Line HoursCapacity Factor %Operational Factor %
19732081048.1567256.663.7
19742071129.6699262.580
19752061284.3670271.476.7
19762061089.5554360.463.3
1977206772571342.965.4
1978206855.2671247.576.8
19792061063.9816158.392.2
1980130310.5243627.227.7
19812061109.4798161.591.1
19822061343670374.476.5
19832061401.2686077.678.3
Total:11406.7

Source: Operating details - IAEA PRIS
Note: "0" signifies a zero value, or no data available. Data from 1972 or later. 