Details

Reactor Type Pressurised Water Reactor (or PWR)
Model Hualong One
Owner Cnnc Fujian Fuqing Nuclear Power Co., Ltd
Operator CNNC Fujian Fuqing Nuclear Power Co Ltd

Timeline

Construction Start Thursday, 7 May 2015
First Criticality Wednesday, 21 October 2020
First Grid Connection Friday, 27 November 2020
Commercial Operation Saturday, 30 January 2021

Specifications

Capacity Net 1075 MWe
Capacity Gross 1161 MWe
Thermal Capacity 3050 MWt
Design Net Capacity 1075 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2020 1000 312 91.72 - - - - -
2021 1075 7965 8461.95 90.10 91.50 91.50 89.00 89.00
2022 1075 6441 6721.77 73.50 74.90 82.80 71.40 79.80
2023 1075 8094 8433.14 92.40 90.60 85.50 89.60 83.10

Source: Operating details - IAEA PRIS