Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | EPR-1750 |
Owner | Edf Energy - China General Nuclear Joint Venture |
Operator | Edf Energy - China General Nuclear Joint Venture |
Timeline
Construction Start | Tuesday, 11 December 2018 |
---|
Specifications
Capacity Net | 1630 MWe |
---|---|
Capacity Gross | 1720 MWe |
Thermal Capacity | 4524 MWt |
Design Net Capacity | 1630 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|