Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | AP1000 |
Owner | Georgia Power Co. |
Operator | Southern Nuclear Operating Company, Inc. |
Timeline
Construction Start | Saturday, 2 March 2013 |
---|---|
First Criticality | Monday, 6 March 2023 |
First Grid Connection | Saturday, 1 April 2023 |
Commercial Operation | Monday, 31 July 2023 |
Specifications
Capacity Net | 1117 MWe |
---|---|
Capacity Gross | 1250 MWe |
Thermal Capacity | 3400 MWt |
Design Net Capacity | 1117 MWe |
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2023 | 1117 | 6625 | 7369.67 | 100.00 | 100.00 | 100.00 | 99.30 | 99.30 |