Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | EPR |
Owner | EDF |
Operator | EDF |
Timeline
Construction Start | Monday, 3 December 2007 |
---|---|
First Criticality | Tuesday, 3 September 2024 |
First Grid Connection | Saturday, 21 December 2024 |
Commercial Operation |
Specifications
Capacity Net | 1630 MWe |
---|---|
Capacity Gross | 1650 MWe |
Thermal Capacity | 4300 MWt |
Design Net Capacity | 1620 MWe |
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|