First nuclear concrete for the reactor was poured in 2010, but construction at the site is currently suspended. For more information see Nuclear Power in Japan
Details
Reactor Type | Boiling Water Reactor (or BWR) |
---|---|
Model | ABWR |
Owner | Electric Power Development Co., Ltd. |
Operator | Electric Power Development Co., Ltd. |
Timeline
Construction Start | Friday, 7 May 2010 |
---|
Specifications
Capacity Net | 1328 MWe |
---|---|
Capacity Gross | 1383 MWe |
Thermal Capacity | 3926 MWt |
Design Net Capacity | 1328 MWe |
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|