Reactor Type High Temperature Gas-Cooled Reactor (or HTGR)
Model Pebble bed reactor prototype
Owner Arbeitsgemeinschaft Versuchsreaktor Gmbh
Operator Arbeitsgemeinschaft Versuchsreaktor Gmbh

Timeline

Construction Start Tuesday, 1 August 1961
First Criticality Tuesday, 16 August 1966
First Grid Connection Sunday, 17 December 1967
Commercial Operation Monday, 19 May 1969
Permanent Shutdown Saturday, 31 December 1988

Specifications

Capacity Net 13 MWe
Capacity Gross 15 MWe
Thermal Capacity 46 MWt
Design Net Capacity 13 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1967 - - - - - - - -
1968 - - - - - - - -
1969 - - - - - - - -
1970 - - - - - - - -
1971 15 6883 97.70 78.60 76.70 - 74.40 -
1972 15 6730 98.70 76.60 74.90 75.80 74.90 74.60
1973 13 7865 99.80 89.80 88.80 79.70 87.60 78.60
1974 13 6295 79.10 71.90 67.90 77.00 69.50 76.40
1975 13 7669 96.00 87.60 86.60 78.80 84.30 77.90
1976 13 8103 101.30 92.20 90.50 80.70 88.70 79.60
1977 13 5055 56.60 57.70 50.40 76.50 49.70 75.60
1978 13 3103 39.30 35.40 34.50 71.50 34.50 70.60
1979 13 2449 12.10 28.00 12.90 65.20 10.60 64.20
1980 13 3892 44.40 44.30 38.10 62.60 38.90 61.70
1981 13 5907 75.00 67.40 64.50 62.70 65.90 62.10
1982 13 5774 74.00 65.90 64.30 62.90 65.00 62.30
1983 13 7198 91.00 82.20 77.10 63.90 79.90 63.60
1984 13 5104 64.00 58.10 56.00 63.40 56.00 63.10
1985 13 6553 85.47 74.80 74.70 64.10 75.10 63.90
1986 13 5738 75.06 65.50 65.50 64.20 65.90 64.00
1987 13 4229 42.54 48.30 48.30 63.30 37.40 62.50
1988 13 5497 61.37 62.60 54.90 62.80 53.70 62.00

Source: Operating details - IAEA PRIS