The Agesta reactor supplied 68 MW of district heating in addition to the electricity supplied.

Details

Reactor Type Pressurized Heavy Water Reactor (or PHWR)
Model R3/Adam
Owner Vattenfall AB
Operator AB SVAFO

Timeline

Construction Start Sunday, 1 December 1957
First Criticality Wednesday, 17 July 1963
First Grid Connection Friday, 1 May 1964
Commercial Operation Friday, 1 May 1964
Permanent Shutdown Sunday, 2 June 1974

Specifications

Capacity Net 10 MWe
Capacity Gross 12 MWe
Thermal Capacity 80 MWt
Design Net Capacity 9 MWe
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1964 - - - - - - - -
1965 - - - - - - - -
1966 - - - - - - - -
1967 - - - - - - - -
1968 - - - - - - - -
1969 - - - - - - - -
1970 - - - - - - - -
1971 12 3072 30.00 35.10 28.50 - 28.50 -
1972 12 0 49.00 0.00 100.00 - 46.50 -
1973 10 6345 43.50 72.40 58.60 - 49.70 -
1974 10 3563 18.10 97.60 78.30 - 49.70 -

Source: Operating details - IAEA PRIS