Keel laying of the barge took place at Wison Heavy Industries shipyard in Nantong, China in August 2022. The floating plant will be deployed to power the Baimskaya copper and gold mine in the Russian Arctic. The precise location of deployment is not yet known.
Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | RITM 200S |
Owner | Rosatom |
Operator | Rosatom |
Timeline
Construction Start | Wednesday, 31 August 2022 |
---|
Specifications
Capacity Net | 50 MWe |
---|---|
Capacity Gross | 57 MWe |
Thermal Capacity | 165 MWt |
Design Net Capacity | 50 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|