Details

Reactor Type Pressurized Heavy Water Reactor (or PHWR)
Model Prototype
Owner Carolinas-Virginia Nuclear Power Assoc.
Operator Carolinas-Virginia Nuclear Power Assoc.

Timeline

Construction Start Friday, 1 January 1960
First Criticality Friday, 1 March 1963
First Grid Connection Wednesday, 18 December 1963
Commercial Operation Wednesday, 18 December 1963
Permanent Shutdown Tuesday, 10 January 1967

Specifications

Capacity Net 17 MWe
Capacity Gross 19 MWe
Thermal Capacity 65 MWt
Design Net Capacity 17 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1963 - - - - - - - -
1964 17 0 0.00 - - - - -
1965 17 0 0.00 - - - - -
1966 17 0 0.00 - - - - -
1967 17 0 0.00 - - - - -

Source: Operating details - IAEA PRIS