Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CNP-600 |
| Owner | China National Nuclear Corporation |
| Operator | Hainan Nuclear Power Company |
Timeline
| Construction Start | Sunday, 21 November 2010 |
|---|---|
| First Criticality | Thursday, 9 June 2016 |
| First Grid Connection | Monday, 20 June 2016 |
| Commercial Operation | Friday, 12 August 2016 |
Specifications
| Capacity Net | 601 MWe |
|---|---|
| Capacity Gross | 650 MWe |
| Thermal Capacity | 1930 MWt |
| Design Net Capacity | 601 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2016 | 601 | 4180 | 1831.25 | 95.90 | 95.30 | 95.30 | 73.00 | 73.00 |
| 2017 | 601 | 7524 | 3417.22 | 85.90 | 88.40 | 90.50 | 64.90 | 67.30 |
| 2018 | 601 | 6531 | 3239.86 | 74.60 | 74.50 | 83.90 | 61.50 | 64.90 |
| 2019 | 601 | 8483 | 4641.87 | 96.80 | 96.20 | 87.50 | 88.20 | 71.70 |
| 2020 | 601 | 7689 | 4328.28 | 87.50 | 92.10 | 88.50 | 82.00 | 74.00 |
| 2021 | 601 | 8147 | 4572.65 | 93.00 | 92.00 | 89.20 | 86.80 | 76.40 |
| 2022 | 601 | 7882 | 4587.19 | 90.00 | 89.70 | 89.20 | 87.10 | 78.10 |
| 2023 | 601 | 8760 | 5110.99 | 100.00 | 99.10 | 90.60 | 97.10 | 80.60 |
| 2024 | 601 | 8109 | 4421.19 | 92.30 | 89.10 | 90.40 | 83.80 | 81.00 |