Details
| Reactor Type | Boiling Water Reactor (or BWR) |
|---|---|
| Model | BWRX-300 |
| Owner | Ontario Power Generation |
| Operator | Ontario Power Generation |
Timeline
| Construction Start | Friday, 26 June 2026 |
|---|
Specifications
| Capacity Net | 280 MWe |
|---|---|
| Capacity Gross | 300 MWe |
| Thermal Capacity | 870 MWt |
| Design Net Capacity | 280 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|