| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CPR-1000 |
| Owner | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
| Operator | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Timeline
| Construction Start | Thursday, 23 December 2010 |
|---|---|
| First Criticality | Wednesday, 29 June 2016 |
| First Grid Connection | Friday, 15 July 2016 |
| Commercial Operation | Saturday, 1 October 2016 |
Specifications
| Capacity Net | 1000 MWe |
|---|---|
| Capacity Gross | 1086 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2016 | 1000 | 3297 | 2648.30 | 88.20 | 100.00 | 100.00 | 91.10 | 91.10 |
| 2017 | 1000 | 6827 | 6569.07 | 77.90 | 80.30 | 84.20 | 75.00 | 78.20 |
| 2018 | 1000 | 7816 | 7655.73 | 89.20 | 99.80 | 91.20 | 87.40 | 82.30 |
| 2019 | 1000 | 7625 | 7579.32 | 87.00 | 92.10 | 91.50 | 86.50 | 83.60 |
| 2020 | 1000 | 7911 | 7901.00 | 90.10 | 92.00 | 91.60 | 90.00 | 85.10 |
| 2021 | 1000 | 8760 | 8888.26 | 100.00 | 100.00 | 93.20 | 101.50 | 88.20 |
| 2022 | 1000 | 8129 | 8168.69 | 92.80 | 93.00 | 93.20 | 93.20 | 89.00 |
| 2023 | 1000 | 8018 | 8044.34 | 91.50 | 90.80 | 92.80 | 91.80 | 89.40 |
| 2024 | 1000 | 8401 | 8101.59 | 95.60 | 95.60 | 93.20 | 92.20 | 89.80 |