Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Cnnc Fujian Fuqing Nuclear Power Co., Ltd |
Operator | CNNC Fujian Fuqing Nuclear Power Co Ltd |
Timeline
Construction Start | Friday, 21 November 2008 |
---|---|
First Criticality | Thursday, 24 July 2014 |
First Grid Connection | Wednesday, 20 August 2014 |
Commercial Operation | Saturday, 22 November 2014 |
Specifications
Capacity Net | 1000 MWe |
---|---|
Capacity Gross | 1089 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2014 | 1000 | 949 | 1033.07 | 100.00 | 100.00 | 100.00 | 109.00 | 109.00 |
2015 | 1000 | 6514 | 6032.38 | 74.40 | 74.10 | 76.10 | 68.90 | 72.00 |
2016 | 1000 | 7511 | 6662.04 | 85.50 | 99.30 | 87.30 | 75.80 | 73.80 |
2017 | 1000 | 7930 | 7535.41 | 90.50 | 89.80 | 88.10 | 86.00 | 77.80 |
2018 | 1000 | 7702 | 7398.98 | 87.90 | 86.60 | 87.70 | 84.50 | 79.40 |
2019 | 1000 | 7072 | 6417.64 | 80.70 | 88.60 | 87.90 | 73.30 | 78.20 |
2020 | 1000 | 8706 | 8222.85 | 99.10 | 98.60 | 89.70 | 93.60 | 80.80 |
2021 | 1000 | 8166 | 7967.88 | 93.20 | 92.00 | 90.00 | 91.00 | 82.20 |
2022 | 1000 | 8001 | 7927.14 | 91.30 | 90.30 | 90.00 | 90.50 | 83.20 |
2023 | 1000 | 8760 | 8746.94 | 100.00 | 99.60 | 91.10 | 99.80 | 85.00 |