Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CPR-1000 |
| Owner | Cnnc Fujian Fuqing Nuclear Power Co., Ltd |
| Operator | CNNC Fujian Fuqing Nuclear Power Co Ltd |
Timeline
| Construction Start | Wednesday, 17 June 2009 |
|---|---|
| First Criticality | Wednesday, 22 July 2015 |
| First Grid Connection | Thursday, 6 August 2015 |
| Commercial Operation | Friday, 16 October 2015 |
Specifications
| Capacity Net | 1000 MWe |
|---|---|
| Capacity Gross | 1089 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2015 | 1000 | 3487 | 2017.22 | 100.00 | 100.00 | 100.00 | 87.80 | 87.80 |
| 2016 | 1000 | 6807 | 6070.84 | 77.50 | 81.50 | 84.10 | 69.10 | 71.80 |
| 2017 | 1000 | 7659 | 7416.83 | 87.40 | 86.60 | 85.20 | 84.70 | 77.70 |
| 2018 | 1000 | 7587 | 7255.87 | 86.60 | 84.80 | 85.10 | 82.80 | 79.30 |
| 2019 | 1000 | 8685 | 7893.35 | 99.10 | 98.90 | 88.40 | 90.10 | 81.90 |
| 2020 | 1000 | 8137 | 7726.34 | 92.60 | 91.50 | 89.00 | 88.00 | 83.10 |
| 2021 | 1000 | 7781 | 7482.49 | 88.80 | 87.70 | 88.80 | 85.40 | 83.50 |
| 2022 | 1000 | 8610 | 8194.52 | 98.30 | 99.00 | 90.20 | 93.50 | 84.90 |
| 2023 | 1000 | 7893 | 7775.95 | 90.10 | 92.20 | 90.50 | 88.80 | 85.40 |
| 2024 | 1000 | 7772 | 7657.12 | 88.50 | 89.30 | 90.40 | 87.20 | 85.60 |