Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | HPR1000 |
| Owner | Cnnc Fujian Fuqing Nuclear Power Co., Ltd |
| Operator | Cnnc Fujian Fuqing Nuclear Power Co., Ltd |
Timeline
| Construction Start | Tuesday, 22 December 2015 |
|---|---|
| First Criticality | Saturday, 11 December 2021 |
| First Grid Connection | Saturday, 1 January 2022 |
| Commercial Operation | Friday, 25 March 2022 |
Specifications
| Capacity Net | 1075 MWe |
|---|---|
| Capacity Gross | 1150 MWe |
| Thermal Capacity | 3060 MWt |
| Design Net Capacity | 1075 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2022 | 1075 | 8449 | 8810.67 | 95.30 | 95.20 | 95.20 | 91.70 | 91.70 |
| 2023 | 1075 | 7110 | 7371.42 | 81.20 | 79.30 | 86.10 | 78.30 | 84.10 |
| 2024 | 1075 | 8042 | 8413.86 | 91.60 | 89.80 | 87.40 | 89.10 | 85.90 |