Details
| Reactor Type | Boiling Water Reactor (or BWR) |
|---|---|
| Model | 25 |
| Owner | General Electric And Pacific Gas And Electric Company |
| Operator | General Electric |
Timeline
| Construction Start | Sunday, 1 January 1956 |
|---|---|
| First Criticality | Saturday, 3 August 1957 |
| First Grid Connection | Saturday, 19 October 1957 |
| Commercial Operation | Saturday, 19 October 1957 |
| Permanent Shutdown | Monday, 9 December 1963 |
Specifications
| Capacity Net | 24 MWe |
|---|---|
| Capacity Gross | 24 MWe |
| Thermal Capacity | 50 MWt |
| Design Net Capacity | 24 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 1957 | - | - | - | - | - | - | - | - |
| 1958 | - | - | - | - | - | - | - | - |
| 1959 | - | - | - | - | - | - | - | - |
| 1960 | - | - | - | - | - | - | - | - |
| 1961 | - | - | - | - | - | - | - | - |
| 1962 | - | - | - | - | - | - | - | - |
| 1963 | - | - | - | - | - | - | - | - |