Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | AP1000 |
| Owner | China Power Investment Group |
| Operator | Shandong Nuclear Power Company, Ltd. |
Timeline
| Construction Start | Thursday, 24 September 2009 |
|---|---|
| First Criticality | Wednesday, 8 August 2018 |
| First Grid Connection | Friday, 17 August 2018 |
| Commercial Operation | Monday, 22 October 2018 |
Specifications
| Capacity Net | 1170 MWe |
|---|---|
| Capacity Gross | 1250 MWe |
| Thermal Capacity | 3415 MWt |
| Design Net Capacity | 1126 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2018 | 1170 | 2870 | 2746.03 | 95.30 | 94.20 | 94.20 | 93.90 | 93.90 |
| 2019 | 1170 | 8221 | 9456.75 | 93.80 | 96.50 | 96.10 | 92.30 | 92.50 |
| 2020 | 1170 | 7701 | 8762.30 | 87.70 | 85.70 | 91.30 | 85.30 | 89.20 |
| 2021 | 1170 | 8030 | 9133.85 | 91.70 | 91.80 | 91.40 | 89.10 | 89.10 |
| 2022 | 1170 | 8409 | 9520.82 | 96.00 | 94.60 | 92.20 | 92.90 | 90.00 |
| 2023 | 1170 | 7882 | 8971.59 | 90.00 | 89.60 | 91.70 | 87.50 | 89.60 |
| 2024 | 1170 | 8113 | 9796.12 | 92.40 | 92.30 | 91.80 | 95.30 | 90.50 |