Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CPR-1000 |
| Owner | Liaoning Hongyanhe Nuclear Power Co Ltd |
| Operator | Liaoning Hongyanhe Nuclear Power Co Ltd |
Timeline
| Construction Start | Friday, 28 March 2008 |
|---|---|
| First Criticality | Thursday, 24 October 2013 |
| First Grid Connection | Saturday, 23 November 2013 |
| Commercial Operation | Tuesday, 13 May 2014 |
Specifications
| Capacity Net | 1061 MWe |
|---|---|
| Capacity Gross | 1119 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1061 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2013 | 1061 | 340 | 82.00 | - | - | - | - | - |
| 2014 | 1061 | 5053 | 4963.31 | 79.80 | 81.10 | 81.10 | 72.50 | 72.50 |
| 2015 | 1061 | 3925 | 3496.01 | 44.80 | 65.60 | 71.80 | 37.60 | 51.60 |
| 2016 | 1061 | 5542 | 5288.78 | 63.10 | 87.50 | 77.70 | 56.80 | 53.50 |
| 2017 | 1061 | 6250 | 5790.37 | 71.40 | 96.00 | 82.70 | 62.30 | 55.90 |
| 2018 | 1061 | 7723 | 7737.78 | 88.20 | 88.20 | 83.90 | 83.20 | 61.80 |
| 2019 | 1061 | 8056 | 8077.34 | 92.00 | 89.70 | 84.90 | 86.90 | 66.20 |
| 2020 | 1061 | 8018 | 7767.35 | 91.30 | 89.30 | 85.60 | 83.30 | 68.80 |
| 2021 | 1061 | 8027 | 8195.34 | 91.60 | 89.40 | 86.10 | 88.20 | 71.30 |
| 2022 | 1061 | 8760 | 8882.06 | 100.00 | 98.00 | 87.40 | 95.60 | 74.10 |
| 2023 | 1061 | 8140 | 8143.39 | 92.90 | 90.50 | 87.80 | 87.60 | 75.50 |
| 2024 | 1061 | 7825 | 7649.97 | 89.10 | 86.80 | 87.70 | 82.10 | 76.10 |