Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Liaoning Hongyanhe Nuclear Power Co Ltd |
Operator | Liaoning Hongyanhe Nuclear Power Co Ltd |
Timeline
Construction Start | Saturday, 15 August 2009 |
---|---|
First Criticality | Saturday, 5 March 2016 |
First Grid Connection | Friday, 1 April 2016 |
Commercial Operation | Wednesday, 8 June 2016 |
Specifications
Capacity Net | 1061 MWe |
---|---|
Capacity Gross | 1119 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1061 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2016 | 1000 | 1200 | 1130.44 | 54.40 | 100.00 | 100.00 | 51.20 | 51.20 |
2017 | 1061 | 3638 | 3276.06 | 41.50 | 85.10 | 90.40 | 35.20 | 30.50 |
2018 | 1061 | 5361 | 5198.53 | 61.20 | 84.10 | 87.90 | 55.90 | 40.50 |
2019 | 1061 | 7035 | 7117.14 | 80.30 | 90.40 | 88.60 | 76.60 | 50.60 |
2020 | 1061 | 8183 | 7755.39 | 93.20 | 91.30 | 89.20 | 83.20 | 57.80 |
2021 | 1061 | 8177 | 8327.55 | 93.30 | 91.20 | 89.60 | 89.60 | 63.50 |
2022 | 1061 | 8076 | 8000.10 | 92.20 | 89.50 | 89.60 | 86.10 | 67.00 |
2023 | 1061 | 7655 | 7771.55 | 87.40 | 87.40 | 89.30 | 83.60 | 69.20 |