Details
| Reactor Type | Boiling Water Reactor (or BWR) |
|---|---|
| Model | BWR-1 |
| Owner | Japan Atomic Energy Agency |
| Operator | Japan Atomic Energy Agency |
Timeline
| Construction Start | Thursday, 1 December 1960 |
|---|---|
| First Criticality | Thursday, 22 August 1963 |
| First Grid Connection | Saturday, 26 October 1963 |
| Commercial Operation | Monday, 15 March 1965 |
| Permanent Shutdown | Thursday, 18 March 1976 |
Specifications
| Capacity Net | 12 MWe |
|---|---|
| Capacity Gross | 13 MWe |
| Thermal Capacity | 90 MWt |
| Design Net Capacity | 10 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 1963 | - | - | - | - | - | - | - | - |
| 1964 | - | - | - | - | - | - | - | - |
| 1965 | - | - | - | - | - | - | - | - |
| 1966 | - | - | - | - | - | - | - | - |
| 1967 | - | - | - | - | - | - | - | - |
| 1968 | - | - | - | - | - | - | - | - |
| 1969 | - | - | - | - | - | - | - | - |
| 1970 | - | - | - | - | - | - | - | - |
| 1971 | - | - | - | - | - | - | - | - |
| 1972 | - | - | - | - | - | - | - | - |
| 1973 | - | - | - | - | - | - | - | - |
| 1974 | 12 | 0 | 0.00 | 0.00 | -4.20 | - | 0.00 | - |
| 1975 | 12 | 920 | 6.50 | 10.50 | 2.00 | - | 6.20 | - |
| 1976 | 12 | 454 | 4.30 | 20.80 | 12.20 | - | 16.40 | - |