Details
Reactor Type | Boiling Water Reactor (or BWR) |
---|---|
Model | BWR-1 |
Owner | Japan Atomic Energy Agency |
Operator | Japan Atomic Energy Agency |
Timeline
Construction Start | Thursday, 1 December 1960 |
---|---|
First Criticality | Thursday, 22 August 1963 |
First Grid Connection | Saturday, 26 October 1963 |
Commercial Operation | Monday, 15 March 1965 |
Permanent Shutdown | Thursday, 18 March 1976 |
Specifications
Capacity Net | 12 MWe |
---|---|
Capacity Gross | 13 MWe |
Thermal Capacity | 90 MWt |
Design Net Capacity | 10 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
1963 | - | - | - | - | - | - | - | - |
1964 | - | - | - | - | - | - | - | - |
1965 | - | - | - | - | - | - | - | - |
1966 | - | - | - | - | - | - | - | - |
1967 | - | - | - | - | - | - | - | - |
1968 | - | - | - | - | - | - | - | - |
1969 | - | - | - | - | - | - | - | - |
1970 | - | - | - | - | - | - | - | - |
1971 | - | - | - | - | - | - | - | - |
1972 | - | - | - | - | - | - | - | - |
1973 | - | - | - | - | - | - | - | - |
1974 | 12 | 0 | 0.00 | 0.00 | -4.20 | - | 0.00 | - |
1975 | 12 | 920 | 6.50 | 10.50 | 2.00 | - | 6.20 | - |
1976 | 12 | 454 | 4.30 | 20.80 | 12.20 | - | 16.40 | - |