Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | HPR1000 |
Owner | Pakistan Atomic Energy Commission |
Operator | Pakistan Atomic Energy Commission |
Timeline
Construction Start | Thursday, 20 August 2015 |
---|---|
First Criticality | Tuesday, 2 March 2021 |
First Grid Connection | Thursday, 18 March 2021 |
Commercial Operation | Friday, 21 May 2021 |
Specifications
Capacity Net | 1017 MWe |
---|---|
Capacity Gross | 1100 MWe |
Thermal Capacity | 3060 MWt |
Design Net Capacity | 1017 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2021 | 1014 | 5910 | 6208.89 | 96.40 | 98.60 | 98.60 | 98.80 | 98.80 |
2022 | 1017 | 6540 | 6240.36 | 74.70 | 70.30 | 80.80 | 70.00 | 80.60 |
2023 | 1017 | 6570 | 6136.80 | 75.00 | 71.70 | 77.20 | 68.90 | 76.10 |