Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | VVER V-510 |
Owner | Joint Stock Company 'Concern Rosenergoatom' |
Operator | Joint Stock Company 'Concern Rosenergoatom' |
Timeline
Construction Start | Saturday, 28 April 2018 |
---|---|
First Criticality | Saturday, 23 November 2024 |
Specifications
Capacity Net | 1200 MWe |
---|---|
Capacity Gross | 1255 MWe |
Thermal Capacity | 3300 MWt |
Design Net Capacity | 1200 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|