Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | PWR |
| Owner | SCN |
| Operator | Kernkraftwerk Gundremmingen Gmbh |
Timeline
| Construction Start | Wednesday, 15 January 1975 |
|---|---|
| First Criticality | Saturday, 1 March 1986 |
| First Grid Connection | Friday, 14 March 1986 |
| Commercial Operation | Tuesday, 18 August 1987 |
| Permanent Shutdown | Friday, 9 September 1988 |
Specifications
| Capacity Net | 1219 MWe |
|---|---|
| Capacity Gross | 1302 MWe |
| Thermal Capacity | 3760 MWt |
| Design Net Capacity | 1219 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 1986 | 1165 | 0 | 1357.59 | - | - | - | - | - |
| 1987 | 1165 | 1564 | 2904.30 | 42.60 | 92.90 | 92.90 | 67.90 | 67.90 |
| 1988 | 1219 | 5884 | 6029.36 | 96.90 | 95.70 | 94.70 | 81.50 | 76.40 |