Reactor Type Pressurised Water Reactor (or PWR)
Model CPR-1000
Owner Fujian Ningde Nuclear Power Company, Ltd.
Operator Fujian Ningde Nuclear Power Company, Ltd.

Timeline

Construction Start Monday, 18 February 2008
First Criticality Saturday, 24 November 2012
First Grid Connection Friday, 28 December 2012
Commercial Operation Monday, 15 April 2013

Specifications

Capacity Net 1018 MWe
Capacity Gross 1089 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1018 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2012 1018 81 4.12 - - - - -
2013 1018 7369 6947.98 99.30 99.90 99.90 96.60 96.60
2014 1018 5119 5047.23 58.40 56.70 75.30 56.60 73.80
2015 1018 7798 7583.95 89.00 88.00 79.90 85.00 77.90
2016 1018 7207 6764.98 82.00 97.30 84.60 75.60 77.30
2017 1018 7177 7210.58 81.90 83.80 84.40 80.90 78.00
2018 1018 7756 8116.45 88.50 88.50 85.10 91.00 80.30
2019 1018 8567 8608.23 97.80 96.50 86.80 96.50 82.70
2020 1018 8007 8119.41 91.20 90.80 87.30 90.80 83.70
2021 1018 8070 8209.23 92.10 92.10 87.90 92.10 84.70
2022 1018 8760 8917.03 100.00 100.00 89.10 100.00 86.30
2023 1018 7454 7443.81 85.10 83.50 88.60 83.50 86.00

Source: Operating details - IAEA PRIS