Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CNP-600 |
Owner | Nuclear Power Plant Qinshan Joint Venture Company Ltd. |
Operator | Cnnc Nuclear Operation Management Company Limited |
Timeline
Construction Start | Sunday, 28 January 2007 |
---|---|
First Criticality | Thursday, 17 November 2011 |
First Grid Connection | Friday, 25 November 2011 |
Commercial Operation | Friday, 30 December 2011 |
Specifications
Capacity Net | 623 MWe |
---|---|
Capacity Gross | 660 MWe |
Thermal Capacity | 1930 MWt |
Design Net Capacity | 619 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2011 | 610 | 614 | 257.02 | - | - | - | - | - |
2012 | 610 | 8438 | 5195.81 | 96.10 | 95.80 | 95.80 | 97.00 | 97.00 |
2013 | 610 | 7428 | 4591.39 | 84.80 | 84.20 | 90.00 | 85.90 | 91.40 |
2014 | 610 | 7905 | 4844.49 | 90.20 | 88.90 | 89.60 | 90.70 | 91.20 |
2015 | 610 | 7994 | 4837.34 | 91.30 | 91.10 | 90.00 | 90.50 | 91.00 |
2016 | 610 | 8130 | 4983.82 | 92.60 | 91.90 | 90.40 | 93.00 | 91.40 |
2017 | 619 | 7993 | 4899.45 | 91.20 | 90.10 | 90.30 | 90.40 | 91.20 |
2018 | 619 | 7760 | 4786.77 | 88.60 | 88.20 | 90.00 | 88.30 | 90.80 |
2019 | 619 | 7815 | 4812.21 | 89.20 | 91.90 | 90.30 | 88.80 | 90.60 |
2020 | 619 | 8784 | 5276.68 | 100.00 | 100.00 | 91.40 | 97.00 | 91.30 |
2021 | 619 | 7898 | 4882.83 | 90.20 | 89.00 | 91.10 | 90.00 | 91.20 |
2022 | 619 | 7861 | 4812.10 | 89.70 | 88.80 | 90.90 | 88.70 | 90.90 |
2023 | 623 | 8760 | 5419.73 | 100.00 | 99.40 | 91.60 | 99.30 | 91.60 |