Reactor Type Pressurised Water Reactor (or PWR)
Model PWR
Owner Sacramento Municipal Utility District
Operator Sacramento Municipal Utility District

Timeline

Construction Start Tuesday, 1 April 1969
First Criticality Monday, 16 September 1974
First Grid Connection Sunday, 13 October 1974
Commercial Operation Thursday, 17 April 1975
Permanent Shutdown Wednesday, 7 June 1989

Specifications

Capacity Net 873 MWe
Capacity Gross 917 MWe
Thermal Capacity 2772 MWt
Design Net Capacity 918 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1974 913 0 197.40 - - - - -
1975 846 3528 2510.30 24.00 22.10 22.10 22.10 22.10
1976 870 2662 2205.00 30.30 28.50 26.00 28.80 26.20
1977 873 6748 5873.50 77.00 76.40 45.00 76.80 45.30
1978 873 7046 4983.90 80.40 65.20 50.60 65.20 50.70
1979 873 6775 5711.90 77.30 74.60 55.70 74.70 55.90
1980 873 5301 4414.90 60.40 60.80 56.60 57.60 56.20
1981 873 3522 2631.10 40.20 40.70 54.20 34.40 52.90
1982 873 4668 3366.50 53.30 53.80 54.20 44.00 51.80
1983 873 4101 2850.70 46.80 47.00 53.40 37.30 50.10
1984 873 5116 3767.55 58.20 58.30 53.90 49.10 50.00
1985 873 2699 1936.24 30.80 30.80 51.70 25.30 47.70
1986 873 0 0.00 0.00 0.00 47.30 0.00 43.60
1987 873 0 0.00 0.00 0.00 43.50 0.00 40.10
1988 873 5227 2852.15 59.50 67.60 45.30 37.20 39.90
1989 873 2214 1446.09 56.90 56.90 45.60 43.30 40.00

Source: Operating details - IAEA PRIS