Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | VVER V-320 |
| Owner | Joint Stock Company 'Concern Rosenergoatom' |
| Operator | Joint Stock Company 'Concern Rosenergoatom' |
Timeline
| Construction Start | Tuesday, 15 September 2009 |
|---|---|
| First Criticality | Sunday, 7 December 2014 |
| First Grid Connection | Saturday, 27 December 2014 |
| Commercial Operation | Thursday, 17 September 2015 |
Specifications
| Capacity Net | 950 MWe |
|---|---|
| Capacity Gross | 1000 MWe |
| Thermal Capacity | 3000 MWt |
| Design Net Capacity | 950 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2014 | 1011 | 68 | 16.28 | - | - | - | - | - |
| 2015 | 950 | 7040 | 5132.22 | 100.00 | 99.60 | 99.60 | 104.60 | 104.60 |
| 2016 | 950 | 6728 | 6110.00 | 76.60 | 72.00 | 77.50 | 73.20 | 79.50 |
| 2017 | 950 | 6888 | 6422.53 | 78.60 | 76.40 | 77.00 | 77.20 | 78.50 |
| 2018 | 950 | 7962 | 7709.57 | 90.90 | 90.20 | 81.10 | 92.60 | 82.80 |
| 2019 | 950 | 7848 | 7360.63 | 89.60 | 87.50 | 82.60 | 88.40 | 84.20 |
| 2020 | 950 | 8081 | 7651.88 | 92.00 | 89.90 | 84.00 | 91.70 | 85.60 |
| 2021 | 950 | 8010 | 7615.55 | 91.40 | 90.20 | 85.00 | 91.50 | 86.50 |
| 2022 | 950 | 8016 | 8018.57 | 91.50 | 91.50 | 85.90 | 96.40 | 87.90 |
| 2023 | 950 | 7783 | 7755.53 | 88.80 | 88.70 | 86.20 | 93.20 | 88.50 |
| 2024 | 950 | 8027 | 8001.65 | 91.40 | 90.70 | 86.70 | 95.90 | 89.30 |