Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | APR-1400 |
| Owner | Korea Hydro And Nuclear Power Co. |
| Operator | Korea Hydro And Nuclear Power Co. |
Timeline
| Construction Start | Wednesday, 19 August 2009 |
|---|---|
| First Criticality | Monday, 8 April 2019 |
| First Grid Connection | Monday, 22 April 2019 |
| Commercial Operation | Thursday, 29 August 2019 |
Specifications
| Capacity Net | 1392 MWe |
|---|---|
| Capacity Gross | 1491 MWe |
| Thermal Capacity | 3983 MWt |
| Design Net Capacity | 1340 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2019 | 1418 | 4874 | 6107.40 | 100.00 | 100.00 | 100.00 | 100.30 | 100.30 |
| 2020 | 1418 | 6778 | 9543.62 | 77.20 | 76.70 | 82.50 | 76.60 | 82.60 |
| 2021 | 1418 | 6635 | 9252.75 | 75.70 | 74.80 | 79.20 | 74.50 | 79.10 |
| 2022 | 1418 | 7135 | 9954.85 | 81.40 | 80.20 | 79.50 | 80.10 | 79.40 |
| 2023 | 1418 | 8760 | 12295.49 | 100.00 | 99.40 | 84.10 | 99.00 | 83.90 |
| 2024 | 1392 | 7516 | 10557.79 | 85.60 | 84.90 | 84.20 | 86.40 | 84.40 |