Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | Hualong One |
| Owner | CGN |
| Operator | CGN |
Timeline
| Construction Start | Wednesday, 19 November 2025 |
|---|
Specifications
| Capacity Net | 1117 MWe |
|---|---|
| Capacity Gross | 1210 MWe |
| Thermal Capacity | 3180 MWt |
| Design Net Capacity | 1117 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|