Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | AP1000 |
Owner | Sanmen Nuclear Power Co., Ltd. |
Operator | Sanmen Nuclear Power Co., Ltd. |
Timeline
Construction Start | Sunday, 19 April 2009 |
---|---|
First Criticality | Thursday, 21 June 2018 |
First Grid Connection | Saturday, 30 June 2018 |
Commercial Operation | Friday, 21 September 2018 |
Specifications
Capacity Net | 1157 MWe |
---|---|
Capacity Gross | 1251 MWe |
Thermal Capacity | 3400 MWt |
Design Net Capacity | 1157 MWe |
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2018 | 1157 | 3840 | 3330.63 | 100.00 | 99.80 | 99.80 | 99.40 | 99.40 |
2019 | 1157 | 7909 | 8987.29 | 90.30 | 91.10 | 92.90 | 88.70 | 90.80 |
2020 | 1157 | 7832 | 8757.82 | 89.20 | 87.30 | 90.40 | 86.20 | 88.80 |
2021 | 1157 | 8268 | 9379.74 | 94.40 | 92.90 | 91.20 | 92.60 | 89.90 |
2022 | 1157 | 7821 | 8805.20 | 89.30 | 88.40 | 90.50 | 86.90 | 89.20 |
2023 | 1157 | 8667 | 9887.28 | 98.90 | 97.60 | 91.90 | 97.60 | 90.80 |