Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | AP1000 |
Owner | Sanmen Nuclear Power Co., Ltd. |
Operator | Sanmen Nuclear Power Co., Ltd. |
Timeline
Construction Start | Tuesday, 15 December 2009 |
---|---|
First Criticality | Friday, 17 August 2018 |
First Grid Connection | Friday, 24 August 2018 |
Commercial Operation | Monday, 5 November 2018 |
Specifications
Capacity Net | 1157 MWe |
---|---|
Capacity Gross | 1251 MWe |
Thermal Capacity | 3400 MWt |
Design Net Capacity | 1157 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2018 | 1157 | 2381 | 2252.77 | 85.20 | 85.10 | 85.10 | 85.80 | 85.80 |
2019 | 1157 | 817 | 905.96 | 9.30 | 8.90 | 19.80 | 8.90 | 20.00 |
2020 | 1157 | 7871 | 8786.18 | 89.60 | 97.20 | 55.60 | 86.40 | 50.70 |
2021 | 1157 | 8085 | 9140.14 | 92.30 | 90.20 | 66.50 | 90.20 | 63.10 |
2022 | 1157 | 8087 | 9254.09 | 92.30 | 91.30 | 72.50 | 91.30 | 69.90 |
2023 | 1157 | 8110 | 9240.77 | 92.60 | 91.20 | 76.10 | 91.20 | 74.00 |