Details
Reactor Type | Fast Reactor (or FBR) |
---|---|
Model | BREST-OD-300� |
Owner | |
Operator |
Timeline
Construction Start | Tuesday, 8 June 2021 |
---|
Specifications
Capacity Net | 300 MWe |
---|---|
Capacity Gross | 300 MWe |
Thermal Capacity | 700 MWt |
Design Net Capacity | 300 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|