Details
| Reactor Type | Fast Reactor (or FBR) |
|---|---|
| Model | BREST-OD-300� |
| Owner | |
| Operator |
Timeline
| Construction Start | Tuesday, 8 June 2021 |
|---|
Specifications
| Capacity Net | 300 MWe |
|---|---|
| Capacity Gross | 300 MWe |
| Thermal Capacity | 700 MWt |
| Design Net Capacity | 300 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|