Construction start no later than date taken from satellite data showing construction underway. Official first concrete is to be confirmed and may be up to 12 months earlier
Grid connection approximate. May be up to 2 months earlier.
Capacities are estimates.
Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CAP1400 |
| Owner | SPIC |
| Operator | SPIC |
Timeline
| Construction Start | Tuesday, 21 April 2020 |
|---|---|
| First Grid Connection | Monday, 1 September 2025 |
| Commercial Operation |
Specifications
| Capacity Net | 1419 MWe |
|---|---|
| Capacity Gross | 1500 MWe |
| Thermal Capacity | 4040 MWt |
| Design Net Capacity | 1400 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|