Details

Reactor Type High Temperature Gas-Cooled Reactor (or HTGR)
Model HTR-PM
Owner China Huaneng Group
Operator Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.

Timeline

Construction Start Sunday, 9 December 2012
First Criticality Sunday, 12 September 2021
First Grid Connection Monday, 20 December 2021
Commercial Operation Tuesday, 5 December 2023

Specifications

Capacity Net 150 MWe
Capacity Gross 211 MWe
Thermal Capacity 500 MWt
Design Net Capacity 200 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2021 200 432 86.40 - - - - -
2022 - - - - - - - -
2023 150 744 112.09 100.00 100.00 100.00 100.40 100.40

Source: Operating details - IAEA PRIS