Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | OPR-1000 |
Owner | Korea Hydro And Nuclear Power Co. |
Operator | Korea Hydro And Nuclear Power Co. |
Timeline
Construction Start | Friday, 16 June 2006 |
---|---|
First Criticality | Thursday, 15 July 2010 |
First Grid Connection | Wednesday, 4 August 2010 |
Commercial Operation | Monday, 28 February 2011 |
Specifications
Capacity Net | 996 MWe |
---|---|
Capacity Gross | 1048 MWe |
Thermal Capacity | 2825 MWt |
Design Net Capacity | 998 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2010 | 1001 | 2051 | 1018.06 | - | - | - | - | - |
2011 | 985 | 8008 | 7867.03 | 100.00 | 99.60 | 99.60 | 100.20 | 100.20 |
2012 | 997 | 7220 | 7091.41 | 82.20 | 81.20 | 89.60 | 81.00 | 89.70 |
2013 | 1000 | 2338 | 2328.10 | 26.70 | 26.50 | 67.20 | 26.60 | 67.30 |
2014 | 999 | 7497 | 7419.09 | 85.60 | 98.20 | 75.30 | 84.80 | 71.90 |
2015 | 999 | 7656 | 7565.55 | 87.40 | 86.40 | 77.60 | 86.40 | 74.90 |
2016 | 997 | 8784 | 8729.83 | 100.00 | 99.60 | 81.40 | 99.70 | 79.20 |
2017 | 997 | 538 | 508.50 | 6.10 | 5.80 | 70.40 | 5.80 | 68.40 |
2018 | 996 | 7107 | 6997.79 | 81.10 | 80.20 | 71.60 | 80.20 | 69.90 |
2019 | 996 | 6602 | 6500.05 | 75.40 | 74.50 | 71.90 | 74.50 | 70.40 |
2020 | 996 | 7986 | 7895.37 | 90.90 | 90.20 | 73.80 | 90.20 | 72.50 |
2021 | 996 | 6949 | 6828.96 | 79.30 | 78.20 | 74.20 | 78.30 | 73.00 |
2022 | 996 | 7519 | 7467.99 | 85.80 | 85.30 | 75.10 | 85.60 | 74.10 |
2023 | 996 | 8760 | 8723.34 | 100.00 | 99.60 | 77.00 | 100.00 | 76.10 |