Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | OPR-1000 |
Owner | Korea Hydro And Nuclear Power Co. |
Operator | Korea Hydro And Nuclear Power Co. |
Timeline
Construction Start | Tuesday, 23 September 2008 |
---|---|
First Criticality | Sunday, 8 February 2015 |
First Grid Connection | Thursday, 26 February 2015 |
Commercial Operation | Friday, 24 July 2015 |
Specifications
Capacity Net | 993 MWe |
---|---|
Capacity Gross | 1048 MWe |
Thermal Capacity | 2825 MWt |
Design Net Capacity | 950 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2015 | 993 | 5821 | 5169.24 | 100.00 | 99.80 | 99.80 | 100.00 | 100.00 |
2016 | 993 | 7328 | 7223.89 | 83.40 | 82.60 | 87.60 | 82.80 | 87.90 |
2017 | 993 | 6298 | 6234.20 | 71.90 | 71.60 | 81.00 | 71.70 | 81.20 |
2018 | 993 | 6783 | 6712.82 | 77.40 | 76.80 | 79.80 | 77.20 | 80.00 |
2019 | 993 | 6622 | 6544.76 | 75.60 | 74.80 | 78.70 | 75.20 | 78.90 |
2020 | 993 | 8784 | 8729.35 | 100.00 | 99.80 | 82.60 | 100.10 | 82.80 |
2021 | 993 | 7733 | 7600.23 | 88.30 | 87.30 | 83.30 | 87.40 | 83.60 |
2022 | 993 | 7433 | 7296.90 | 84.80 | 83.80 | 83.40 | 83.90 | 83.60 |
2023 | 993 | 8760 | 8627.32 | 100.00 | 99.20 | 85.30 | 99.20 | 85.40 |