Details

Reactor Type High Temperature Gas-Cooled Reactor (or HTGR)
Model Pebble bed reactor
Owner Hochtemperatur-Kernkraftwerk Gmbh
Operator Hochtemperatur-Kernkraftwerk Gmbh

Timeline

Construction Start Monday, 3 May 1971
First Criticality Tuesday, 13 September 1983
First Grid Connection Saturday, 16 November 1985
Commercial Operation Monday, 1 June 1987
Permanent Shutdown Thursday, 29 September 1988

Specifications

Capacity Net 296 MWe
Capacity Gross 308 MWe
Thermal Capacity 760 MWt
Design Net Capacity 296 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1985 - - - - - - - -
1986 301 0 558.85 - - - - -
1987 296 3129 1134.33 60.90 45.30 45.30 45.30 45.30
1988 296 1371 294.63 47.20 34.30 41.30 34.30 41.30

Source: Operating details - IAEA PRIS